Total Units
0
Loading production data...
Select a production line or build a new one
Demo credentials: manager / manager123
Assign lines, update access, and remove supervisor accounts.
Use the popup drag-and-drop builder to define stages and layout.
Demo credentials: supervisor / supervisor123
0
0 min
0%
0 u/min
0
0 min
0%
0 u/min
Horizontal timeline with swimlanes for shift, breaks, production and downtime.
Review line access, toggle day/night permissions, and save each supervisor.
Create groups and manually assign production lines to each group.
Create a supervisor account and assign production lines and shifts.
Update supervisor details.
Update the production line name.
Shift-based production visualiser
0
0 min
0%
0 u/min
0
0 min
0%
0 u/min
Horizontal timeline with swimlanes for shift, breaks, production and downtime.
0
0 min
0%
0 u/min
Crew values for Day shift.
Units/min per crew member. Total stage max = (per-crew max) x (crew count).
Click a stage to view performance over time.
Update this stage for the current production line.
Set crew values for each non-transfer stage on this run.
Drag stages on the canvas, edit stage settings, then create the line.